Sunday 8 December 2013

BUDGET OF INFRASTRUCTURE & OTHER DEVELOPMENT WORKS TO BE CARRIED OUT IN OUR ADOPTED TRIBAL VILLAGE NAGLE.

Initial budget for the development works of Nagle village in respect of pure drinking water, road, sanitation, health, education & employment etc. designed by architect is approximate seventy million.
 Here is the step by step estimate :-
1. Pure drinking water connection in whole village with 3 numbers of 50 thousand litres  of overhead tanks : INR 19,35,000.00.
2. Two & half KMs of tar road connecting Divekarpada, Phanaspada & Dongripada & approx. 100 MTs of 12 concrete subways, connecting hillside houses with the main road :- INR 1,83,42,450.00.
 3. Toilet in the houses ( approx. 198 NOS ) :- INR 55,44,000.00.
 4. Toilet in primary school & learning centres :- INR 4,50000.00.
5. Total septic pits :- INR 6,60000.00.
 6. Construction cost of health centre, dairy & small industry units :- INR 1,17,00000.00.
7. Equipment for health centre & small industry units : INR 34,00000.00.
 8. Ambulance :- INR 6,00000.00.
 9. Scientific dairy farm with minimum of 60 buffaloes :- INR 60,00000.00.
 10. Poultry farms with equipment & training :- INR 9,00000.00.
 11. Piggery, goat, rabbit & emu farming with goods, equipment & training etc. :- INR 22,00000.00. 12. Renovation of village pond & fishery :- INR 17,00000.00.
 13. Computer training centre, library & learning centres etc. :- INR 9,60,000.00.
 14. Reconstruction of village crematorium with water, power, wood storage place & boundary wall etc. :- INR 23,70000.00.
15. Other activities like training, campaigns, vaccination, health check-ups, treatment, financial aid to underprivileged villagers etc. :- approx. INR 40,00000.00.
16. Architect, staffs & stationery & all misc. expenses :- approx. INR 75,00000.00.
 Taxes & all other legal expenses are extra whatever applicable.
 Income which will be generated from these community employment schemes will provide jobs to the villagers in one side & in other side, these funds will be utilised for infrastructure maintenance, manpower management & all emergency expenses of the village. NOTES :- Implementation of all the development schemes are subject to fund raising.

Monday 2 December 2013

DEVELOPMENT OF OUR ADOPTED VILLAGE NAGLE.

We are concentrating in the first phase of development works, the solution of pure drinking water which is the biggest scarcity of the village. toilet in each house as all the villagers defecate in the open, vaccination to the children against Polio, Typhoid, Hepatitis A etc., Health check ups, Eye check ups & cataract surgery, Study materials & fees arrangement for underprivileged children, computer training & tailoring, treatment of patients suffering from TB, cancer etc., Then we shall construct concrete roads connecting of all padas which have today no road connectivity. People living in the padas of inside the village used to walk by the narrow kaccha lane for all essential services for nearly 2- 2.5 Km. People living in the hill side is bound to carry water from the plain to the top through kaccha steep lanes endangering their lives. We shall rebuilt the crematorium & set up a dispensary with ambulance service for the primary treatment, snake bite & child birth etc. For the employment & maintenance of the village infrastructure & emergency funds, we shall set up a dairy farm, papad manufacturing unit, poultry, goat, rabbit, emu farming & fishery in the village talav etc.